Skip to content

Architecture & public API contracts ​

INFO

This page describes the package boundaries and public APIs of the monorepo. For the algorithms behind them see Numerical engine; for the development workflow see Contributing. The signatures below are a contract summary — the source in packages/*/src is authoritative.

OpenRiskSim is an open-source, browser-based alternative to Risk Simulator / @RISK / Crystal Ball. The user opens an .xlsx (from Excel, LibreOffice, WPS, Google Sheets…), marks assumption cells (uncertain inputs with a probability distribution) and forecast cells (outputs), runs a Monte Carlo simulation, and gets charts, statistics, sensitivity analysis, plus forecasting, distribution fitting, optimization and project-finance tools. Everything runs locally in the browser (no server).

  • Monorepo with pnpm workspaces. Packages are consumed from source (exports → src/index.ts), no build step.
  • TypeScript strict. Tests with Vitest (pnpm test at the root, files src/**/*.test.ts).
  • Code, comments, identifiers and docs in English. UI is bilingual es/en.
  • License GPL-3.0-or-later (HyperFormula is GPLv3).
  • Never add a runtime dependency to a package without discussing it first. Pure TS math is preferred.
packages/
  core/           shared types only (DistributionSpec, RiskModel, SimulationResult…)
  distributions/  RNG, special functions, 33 distributions, distribution fitting
  engine/         sampling (MC / LHS), correlations, descriptive stats, simulation runner, sensitivity
  finance/        NPV, IRR, MIRR, payback, B/C, depreciation, loans, break-even, scenarios
  forecast/       regression, smoothing, ARIMA, curve fitting, stochastic processes, error metrics
  optimizer/      Nelder–Mead, genetic algorithm, simulated annealing; static/stochastic optimization
  accel/          formula compiler → JavaScript (f64) and WGSL for WebGPU (f32)
  workbook/       xlsx/csv import/export, HyperFormula engine, ModelEvaluator, worker, acceleration, reports
apps/
  web/            React 19 + Vite + Tailwind 4 + ECharts + zustand + i18next UI

Dependency graph: core ← distributions ← engine ← optimizer, core ← finance, distributions ← forecast, core ← accel, workbook ← (core, distributions, engine, finance, accel), web ← everything. workbook loads accel through a dynamic import() (accelDeps.ts), so standard/multicore runs never pay for it and a failure to load it only disables acceleration.


@openrisksim/core ​

Read packages/core/src/*.ts.

Types: DistributionId, DISTRIBUTION_IDS, DistributionSpec, DistributionMeta, ParamMeta, I18nText, Distribution, Rng, CellRef, AssumptionDef, ForecastDef, DecisionVariableDef, CorrelationDef, SamplingMethod, SimulationSettings, DEFAULT_SETTINGS, RiskModel, emptyModel(), ModelEvaluator, DescriptiveStats, HistogramBin, ForecastResult, SensitivityEntry, TornadoEntry, SpiderSeries, SimulationResult, SimulationProgress, newId(), cellKey().

Acceleration and confidence levels:

ts
export type AccelerationMode = "auto" | "standard" | "multicore" | "compiled" | "gpu";
// SimulationSettings: acceleration?: AccelerationMode (missing = "auto"); workers?: number | null (null = hardwareConcurrency − 1, clamped 1…16)
// ForecastDef: certainty?: number (initial two-tail chart band, default 0.9); confidence?: number (CI of the mean, default 0.95)
export interface SimulationBackendInfo {
  mode: "standard" | "multicore" | "compiled" | "gpu";            // what actually ran
  requested: AccelerationMode;
  device?: string;                                                  // "Apple M3 Pro (Metal)", "8 CPU workers"…
  precision: "f64" | "f32"; workers?: number; trialsPerSecond: number;
  fallbackReason?: string;                                          // localized, " · "-joined
  validation?: { checked: number; maxRelativeError: number; passed: boolean };
}
// SimulationResult.backend?: SimulationBackendInfo

@openrisksim/distributions ​

ts
// RNG
export function createRng(seed?: number | null): Rng;            // xoshiro128** (or PCG32); null/undefined → random seed
// Special functions (exported for reuse by forecast/engine)
export function erf(x: number): number; export function erfc(x: number): number;
export function lnGamma(x: number): number; export function gamma(x: number): number;
export function regIncBeta(x: number, a: number, b: number): number;      // I_x(a,b)
export function regIncGammaP(a: number, x: number): number;               // P(a,x)
export function normalCdf(x: number): number; export function normalQuantile(p: number): number; // standard normal (Acklam/Wichura AS241)
export function studentTCdf(t: number, df: number): number; export function studentTQuantile(p: number, df: number): number;
export function chiSquareCdf(x: number, df: number): number; export function fCdf(x: number, d1: number, d2: number): number;

// Registry
export const DISTRIBUTION_META: DistributionMeta[];               // one per DistributionId, bilingual labels, sensible defaults
export function getDistributionMeta(id: DistributionId): DistributionMeta;
export function createDistribution(spec: DistributionSpec): Distribution;   // throws DistributionError on invalid params
export function validateSpec(spec: DistributionSpec): { ok: true } | { ok: false; errors: { key: string; message: I18nText }[] };
export class DistributionError extends Error {}
/** Points for plotting pdf/pmf + cdf: continuous → `n` evenly spaced x over [q(0.001), q(0.999)]; discrete → each integer. */
export function distributionCurve(d: Distribution, n?: number): { x: number[]; pdf: number[]; cdf: number[] };

// Fitting
export interface FitResult {
  spec: DistributionSpec;                 // fitted params
  logLikelihood: number; aic: number; bic: number;
  ks: { statistic: number; pValue: number };
  ad: { statistic: number; pValue: number | null };   // Anderson–Darling (continuous only)
  chiSquare: { statistic: number; pValue: number; bins: number } | null;
  rank: number;                           // 1 = best (by chosen criterion)
}
export function fitDistributions(data: number[], options?: {
  candidates?: DistributionId[];          // default: all families that make sense for the data (e.g. positive-only for lognormal/gamma…)
  discrete?: boolean;                     // default: auto (all integers)
  rankBy?: "ks" | "aic" | "bic" | "ad";   // default "aic"
}): FitResult[];                          // sorted by rank, failed fits omitted

Semantics of params (keys used in DistributionSpec.params) — must match exactly because the UI and xlsx use them: normal{mean,stdDev} · lognormal{mean,stdDev} (of the variable itself, not of ln) · uniform{min,max} · triangular{min,mode,max} · pert{min,mode,max} · beta{alpha,beta,min,max} · gamma{shape,scale} · exponential{rate} · weibull{shape,scale,location} · logistic{mean,scale} · studentT{df,mean,scale} · chiSquare{df} · f{df1,df2} · cauchy{location,scale} · gumbel{location,scale} (max) · frechet{shape,scale,location} · pareto{shape,scale} · laplace{location,scale} · rayleigh{scale} · erlang{k,rate} · arcsine{min,max} · cosine{min,max} · powerFunction{alpha,min,max} · trapezoidal{min,mode1,mode2,max} · bernoulli{p} · binomial{n,p} · poisson{lambda} · geometric{p} (failures before 1st success) · negativeBinomial{r,p} · hypergeometric{population,successes,draws} · discreteUniform{min,max} · custom (values/weights; if weights absent → empirical continuous resampling) · fixed{value}. Truncation spec.truncate is applied by inverse-CDF on the restricted range: q(cdf(min) + u·(cdf(max)−cdf(min))).

@openrisksim/engine ​

ts
/** Generate n×k matrix of uniforms (columns = assumptions). LHS = stratified per column, randomly permuted. */
export function generateUniforms(n: number, k: number, method: SamplingMethod, rng: Rng): Float64Array[];
/** Iman–Conover: reorder columns of `samples` so their rank correlation ≈ target (k×k, symmetric, unit diag). Repairs non-PSD with nearest-PSD. */
export function imanConover(samples: Float64Array[], target: number[][], rng: Rng): Float64Array[];
export function nearestPositiveDefinite(m: number[][]): number[][];
export function cholesky(m: number[][]): number[][];             // lower-triangular; throws if not PD
export function correlationMatrixFromDefs(assumptionIds: string[], defs: CorrelationDef[]): number[][];
/** Samples for every *enabled* assumption, shape [assumption][trial]. Uses createDistribution + quantile(u) with truncation. */
export function sampleAssumptions(model: RiskModel, n: number, rng: Rng): Record<string, Float64Array>;

// Descriptive statistics
export function describe(values: ArrayLike<number>): DescriptiveStats;      // ignores NaN
export function histogram(values: ArrayLike<number>, bins?: number | "auto"): HistogramBin[];  // auto = Freedman–Diaconis clamped [10,100]
export function percentile(sorted: ArrayLike<number>, p: number): number;    // p in [0,1], linear interpolation (Excel PERCENTILE.INC)
export function certainty(values: ArrayLike<number>, lower: number, upper: number): number; // share of values in [lower, upper]
export function pearson(a: ArrayLike<number>, b: ArrayLike<number>): number;
export function spearman(a: ArrayLike<number>, b: ArrayLike<number>): number;
export function empiricalCdf(values: ArrayLike<number>, points?: number): { x: number[]; p: number[] };

// Simulation
export interface RunOptions {
  onProgress?: (completed: number, total: number) => void;   // throttled (~every 1–2% of trials)
  signal?: AbortSignal;                                       // abort → return partial result
  chunkSize?: number;                                         // trials per yield to event loop (default 250)
}
/** Runs the model. Evaluator inputs follow the order of *enabled* assumptions in model.assumptions; outputs follow model.forecasts. */
export async function runSimulation(model: RiskModel, evaluator: ModelEvaluator, options?: RunOptions): Promise<SimulationResult>;
/** Batched pipeline used by every acceleration mode. Samples are drawn once (seed, LHS, correlations, truncation). */
export interface BatchEvaluator { evaluateBatch(inputs: Float64Array /* row-major n×width */, n: number, offset: number, signal?: AbortSignal): Promise<Float64Array> | Float64Array }
export function prepareSimulation(model: RiskModel, n?: number, rng?: Rng): PreparedSimulation; // { seed, trials, assumptionIds, k, samples, columns, fillRows(offset, count, out?, extra?) … }
export async function runSimulationBatched(model: RiskModel, batchEvaluator: BatchEvaluator, options?: BatchedRunOptions): Promise<SimulationResult>;
// BatchedRunOptions: onProgress, signal, batchSize (default 250), precisionCheckEvery (default 250, independent of batchSize so every backend stops at the same trial), prepared, extraInputs
export function batchEvaluatorFromModelEvaluator(evaluator: ModelEvaluator, outputs: number): BatchEvaluator;
export function computeSensitivity(assumptionSamples: Record<string, Float64Array>, forecastValues: Float64Array): SensitivityEntry[]; // sorted by |rankCorrelation| desc
/** One-at-a-time tornado: each enabled assumption at its pLow/pHigh percentile, others at base value. */
export function tornado(model: RiskModel, evaluator: ModelEvaluator, baseInputs: Float64Array, forecastIndex: number, opts?: { pLow?: number; pHigh?: number }): TornadoEntry[]; // default 0.1/0.9, sorted by swing desc
export function spider(model: RiskModel, evaluator: ModelEvaluator, baseInputs: Float64Array, forecastIndex: number, percentiles?: number[]): SpiderSeries[];
/** Scenario table: 2 inputs varied over grids → output matrix (data-table style). */
export function scenarioTable(evaluator: ModelEvaluator, baseInputs: Float64Array, idxA: number, valuesA: number[], idxB: number, valuesB: number[], forecastIndex: number): number[][];
/** Bootstrap of a statistic (confidence of the mean, stdev, percentile). */
export function bootstrap(values: ArrayLike<number>, stat: (v: Float64Array) => number, resamples: number, rng: Rng): { estimate: number; ci95: [number, number]; samples: Float64Array };
// Hypothesis tests on simulated forecasts
export function tTestTwoSample(a: ArrayLike<number>, b: ArrayLike<number>): { t: number; df: number; pValue: number };

@openrisksim/finance ​

All rates as fractions (0.12 = 12%). Cash flow arrays start at period 0. Excel-compatible conventions.

ts
export function npv(rate: number, cashFlows: number[]): number;            // includes period 0 undiscounted (unlike Excel NPV)
export function excelNpv(rate: number, values: number[]): number;          // Excel semantics (first value discounted 1 period)
export function irr(cashFlows: number[], guess?: number): number;          // NaN if none; robust (Newton + bisection fallback)
export function allIrrs(cashFlows: number[]): number[];                    // all sign-change roots in (-0.99, 10)
export function mirr(cashFlows: number[], financeRate: number, reinvestRate: number): number;
export function xnpv(rate: number, cashFlows: number[], dates: Date[]): number;
export function xirr(cashFlows: number[], dates: Date[], guess?: number): number;
export function paybackPeriod(cashFlows: number[]): number;                // fractional periods, Infinity if never
export function discountedPaybackPeriod(rate: number, cashFlows: number[]): number;
export function profitabilityIndex(rate: number, cashFlows: number[]): number;   // PV(inflows after t0)/|initial investment|
export function benefitCostRatio(rate: number, benefits: number[], costs: number[]): number;
export function equivalentAnnualAnnuity(rate: number, cashFlows: number[]): number;
export function pmt(rate: number, nper: number, pv: number, fv?: number, type?: 0 | 1): number;
export function pv(rate: number, nper: number, pmt: number, fv?: number, type?: 0 | 1): number;
export function fv(rate: number, nper: number, pmt: number, pv?: number, type?: 0 | 1): number;
export function nper(rate: number, pmt: number, pv: number, fv?: number, type?: 0 | 1): number;
export function effectiveRate(nominal: number, periodsPerYear: number): number;
export function nominalRate(effective: number, periodsPerYear: number): number;
export function realRate(nominal: number, inflation: number): number;       // Fisher
export function wacc(p: { equity: number; debt: number; costEquity: number; costDebt: number; taxRate: number }): number;
export function capm(p: { riskFree: number; beta: number; marketReturn: number; countryRisk?: number }): number;
export interface AmortizationRow { period: number; payment: number; interest: number; principal: number; balance: number }
export function amortizationSchedule(p: { principal: number; rate: number; periods: number; method: "french" | "german" | "american" }): AmortizationRow[];
export function depreciation(p: { cost: number; salvage: number; life: number; method: "straightLine" | "decliningBalance" | "doubleDeclining" | "sumOfYears" | "units"; units?: number[] }): number[];
/** Generic root-finding break-even: value x such that f(x) = target. */
export function breakEven(f: (x: number) => number, target: number, lo: number, hi: number): number;
export function accountingBreakEven(p: { fixedCosts: number; pricePerUnit: number; variableCostPerUnit: number }): { units: number; revenue: number };
/** Standard project cash-flow builder used by the "Project evaluator" tool. */
export interface ProjectInputs {
  horizon: number; investment: number; workingCapital: number; salvageValue: number;
  units: number[]; price: number[]; variableCost: number[]; fixedCosts: number[];
  depreciationMethod: "straightLine" | "doubleDeclining" | "sumOfYears"; depreciableLife: number;
  taxRate: number; discountRate: number;
  loan?: { amount: number; rate: number; periods: number; method: "french" | "german" | "american" };
}
export interface ProjectCashFlowTable { rows: { key: string; label: I18nText; values: number[] }[]; freeCashFlow: number[]; equityCashFlow: number[] | null }
export function buildProjectCashFlow(inputs: ProjectInputs): ProjectCashFlowTable;
export interface ProjectIndicators { npv: number; irr: number; mirr: number; payback: number; discountedPayback: number; profitabilityIndex: number; eaa: number }
export function projectIndicators(cashFlows: number[], rate: number, reinvestRate?: number): ProjectIndicators;
/** Scenario analysis (pessimistic / base / optimistic, or custom) with probabilities → expected value & stdev. */
export function scenarioAnalysis(s: { name: string; probability: number; value: number }[]): { expected: number; stdDev: number; cv: number };

@openrisksim/forecast ​

Series are number[] (equally spaced periods). Every model returns a common ForecastOutput.

ts
export interface ForecastOutput {
  method: string; params: Record<string, number>;
  fitted: number[];                  // in-sample one-step fitted values (NaN where undefined)
  forecast: number[];                // h periods ahead
  lower95: number[]; upper95: number[]; lower80: number[]; upper80: number[];   // always populated (backward compatibility)
  intervals: { level: number; lower: number[]; upper: number[] }[];               // one per requested level, ascending
  residuals: number[];
  metrics: ErrorMetrics;
}
export interface ErrorMetrics { mae: number; mse: number; rmse: number; mape: number; smape: number; theilU: number; r2: number; aic?: number; bic?: number }
export function errorMetrics(actual: number[], fitted: number[]): ErrorMetrics;
// Every forecasting function below also accepts `opts: IntervalOptions = { levels?: number[] }` (last argument):
// confidence levels as fractions in [0.5, 0.999], default [0.8, 0.95].
export const DEFAULT_LEVELS: readonly number[];                  // [0.8, 0.95]
export function normalizeLevels(levels?: readonly number[]): number[]; // validates [0.5, 0.999], sorts, de-duplicates; undefined → defaults
export function movingAverage(y: number[], h: number, window: number): ForecastOutput;
export function simpleExponentialSmoothing(y: number[], h: number, alpha?: number): ForecastOutput;  // alpha optimised (SSE) when omitted
export function holt(y: number[], h: number, opts?: { alpha?: number; beta?: number; damped?: boolean; phi?: number }): ForecastOutput;
export function holtWinters(y: number[], h: number, period: number, opts?: { seasonal?: "additive" | "multiplicative"; alpha?: number; beta?: number; gamma?: number }): ForecastOutput;
export function arima(y: number[], h: number, order: { p: number; d: number; q: number }): ForecastOutput;   // CSS/least squares + numerical optimiser
export function autoArima(y: number[], h: number, opts?: { maxP?: number; maxD?: number; maxQ?: number }): ForecastOutput; // AIC search
export function autoForecast(y: number[], h: number, period?: number): { best: ForecastOutput; ranking: { method: string; rmse: number; aic?: number }[] };
export function trendForecast(y: number[], h: number, kind: "linear" | "exponential" | "logarithmic" | "power" | "polynomial2" | "polynomial3"): ForecastOutput;

export interface RegressionResult {
  coefficients: { name: string; value: number; stdError: number; t: number; pValue: number; ci95: [number, number] }[];
  r2: number; adjR2: number; fStatistic: number; fPValue: number; standardError: number;
  durbinWatson: number; n: number; k: number; residuals: number[]; fitted: number[];
  vif: number[];                    // multicollinearity per regressor
  anova: { regressionSS: number; residualSS: number; totalSS: number; dfReg: number; dfRes: number };
}
export function multipleRegression(y: number[], X: number[][], names?: string[], opts?: { intercept?: boolean }): RegressionResult; // X: rows = observations
export function stepwiseRegression(y: number[], X: number[][], names?: string[], opts?: { pEnter?: number; pRemove?: number }): RegressionResult & { selected: string[] };
// Both regressions accept opts.confidence (default 0.95, range [0.5, 0.999]): coefficients[].ci at RegressionResult.confidenceLevel (ci95 kept).
/** Point prediction with a Student-t interval: CI of the mean response, or with `prediction: true` the prediction interval of a new observation. */
export function predict(result: RegressionResult, xRow: number[], opts?: { confidence?: number; prediction?: boolean }): { value: number; lower: number; upper: number; stdError: number; level: number };

// Stochastic processes (paths for simulation/charts): returns `paths` × (steps+1)
export function geometricBrownianMotion(p: { s0: number; drift: number; volatility: number; dt: number; steps: number; paths: number; seed?: number }): number[][];
export function meanReversion(p: { s0: number; longRunMean: number; speed: number; volatility: number; dt: number; steps: number; paths: number; seed?: number }): number[][]; // Ornstein–Uhlenbeck
export function jumpDiffusion(p: { s0: number; drift: number; volatility: number; jumpRate: number; jumpMean: number; jumpStdDev: number; dt: number; steps: number; paths: number; seed?: number }): number[][]; // Merton
export function estimateGbm(prices: number[], dt: number): { drift: number; volatility: number };
/** Fan-chart bands: for each level L in (0,1), the (1−L)/2 … (1+L)/2 percentiles across paths at every step, plus the median. */
export function pathPercentileBands(paths: number[][], levels: readonly number[]): { median: number[]; bands: { level: number; lower: number[]; upper: number[] }[] };
// Descriptive time-series tools
export function acf(y: number[], maxLag: number): number[]; export function pacf(y: number[], maxLag: number): number[];
export function decompose(y: number[], period: number, kind?: "additive" | "multiplicative"): { trend: number[]; seasonal: number[]; residual: number[] };
export function seasonalityTest(y: number[], maxPeriod?: number): { period: number; strength: number }[];
export function ljungBox(residuals: number[], lags: number): { q: number; pValue: number };
export function adfTest(y: number[]): { statistic: number; pValue: number; stationary: boolean };

@openrisksim/optimizer ​

ts
export interface OptVariable { id: string; lower: number; upper: number; type: "continuous" | "integer" | "binary" | "discrete"; step?: number }
export interface OptConstraint { id: string; label?: string; /** g(x) must satisfy `op` rhs */ evaluate: (x: number[]) => number | Promise<number>; op: "<=" | ">=" | "="; rhs: number }
export interface OptProblem {
  variables: OptVariable[];
  objective: (x: number[]) => number | Promise<number>;  // may run a full simulation (stochastic optimization)
  sense: "maximize" | "minimize";
  constraints?: OptConstraint[];
  initial?: number[];
}
export interface OptOptions {
  algorithm?: "auto" | "nelderMead" | "genetic" | "simulatedAnnealing";  // auto: GA if any integer/binary/discrete var, else NM with restarts
  maxEvaluations?: number; tolerance?: number; seed?: number; populationSize?: number;
  onProgress?: (p: { evaluations: number; best: number; bestX: number[] }) => void;
  signal?: AbortSignal;
}
export interface OptResult {
  x: number[]; value: number; feasible: boolean; evaluations: number;
  constraintValues: number[]; history: { evaluation: number; best: number }[]; algorithm: string; message: string;
}
export async function optimize(problem: OptProblem, options?: OptOptions): Promise<OptResult>;
/** Efficient frontier: re-optimize while sweeping one constraint's rhs. */
export async function efficientFrontier(problem: OptProblem, constraintId: string, rhsValues: number[], options?: OptOptions): Promise<{ rhs: number; result: OptResult }[]>;
/** Builds the objective for stochastic optimization: statistic of a forecast after a simulation with decisions fixed. */
export type ForecastStatistic = "mean" | "median" | "stdDev" | "cv" | "p5" | "p10" | "p90" | "p95" | "probAbove" | "probBelow";
export function statisticOf(values: Float64Array, stat: ForecastStatistic, threshold?: number): number;

@openrisksim/workbook ​

ts
// In-memory workbook representation (what the grid renders)
export interface CellData { v?: number | string | boolean | null; f?: string /* formula without "=" */; t?: "n" | "s" | "b" | "e"; z?: string /* number format */; s?: CellStyle }
export interface CellStyle { bold?: boolean; italic?: boolean; color?: string; bg?: string; align?: "left" | "center" | "right" }
export interface SheetData { name: string; rows: number; cols: number; cells: Record<string, CellData> /* key: A1 */; colWidths?: Record<number, number>; merges?: string[] }
export interface WorkbookData { sheets: SheetData[]; model: RiskModel | null /* stored in hidden sheet "_openrisksim" */; fileName?: string }

export async function readXlsx(buf: ArrayBuffer, fileName?: string): Promise<WorkbookData>;
export async function readCsv(text: string, fileName?: string): Promise<WorkbookData>;
export async function writeXlsx(wb: WorkbookData, opts?: { includeModel?: boolean; reports?: ReportSheet[] }): Promise<ArrayBuffer>;
export interface ReportSheet { name: string; rows: (string | number | null)[][]; images?: { pngBase64: string; at: string; width: number; height: number }[] }
export function buildSimulationReport(model: RiskModel, result: SimulationResult, locale: "es" | "en"): ReportSheet[];

// Address helpers
export function parseA1(a1: string): { row: number; col: number };     // 0-based
export function toA1(row: number, col: number): string;
export function parseRange(range: string): { start: { row: number; col: number }; end: { row: number; col: number } };
export function colToLetters(col: number): string;

// Formula engine (HyperFormula wrapper)
export class SpreadsheetEngine {
  static fromWorkbook(wb: WorkbookData): SpreadsheetEngine;
  getValue(ref: CellRef): number | string | boolean | null | { error: string };
  getFormula(ref: CellRef): string | null;
  setCell(ref: CellRef, input: string | number | null): void;  // "=..." → formula
  getRangeValues(sheet: string, range: string): (number | string | boolean | null)[][];
  setRangeValues(sheet: string, topLeft: string, values: (number | string | null)[][]): void;
  sheetNames(): string[];
  addSheet(name: string): void;
  toWorkbookData(model: RiskModel | null): WorkbookData;       // serialise current state (formulas + values)
  onChange(cb: (changed: CellRef[]) => void): () => void;
  undo(): void; redo(): void;
  destroy(): void;
}
/** Fast evaluator: sets assumption cells, recalculates, reads forecasts. Restores original contents on dispose(). */
export function createWorkbookEvaluator(engine: SpreadsheetEngine, model: RiskModel, overrides?: { decisions?: { ref: CellRef; value: number }[] }): ModelEvaluator & { baseInputs(): Float64Array; dispose(): void };
/** Simulation in a Web Worker. */
export interface SimulationJob { workbook: WorkbookData; model: RiskModel; decisionValues?: Record<string, number> }
export function runSimulationInWorker(job: SimulationJob, onProgress?: (p: SimulationProgress) => void, signal?: AbortSignal): Promise<SimulationResult>;

// Acceleration (acceleration.ts) — runs inside the simulation worker; see the @openrisksim/accel section below
export function runAcceleratedSimulation(job: SimulationJob, onProgress?, signal?, env?: AccelerationEnv): Promise<SimulationResult>; // never fails because of acceleration
export function chooseAccelerationMode(p: AccelerationPlanInput): { mode: BackendMode; fallback?: "gpu-unavailable" | "not-gpu-compatible" | "not-compiled" | "no-workers" };
//   auto: gpu if available + GPU-compatible + trials ≥ 20 000 (AUTO_GPU_MIN_TRIALS); else compiled if it compiles;
//         else multicore if trials ≥ 2 000 (AUTO_MULTICORE_MIN_TRIALS) and > 1 thread/worker; else standard.
//   explicit: gpu → compiled → standard, compiled → standard, multicore → standard.
export function detectAccelerationCapabilities(source: FormulaSource | WorkbookData, model: RiskModel, options?: { decisionValues?; gpu?: boolean }): Promise<AccelerationCapabilities>;
export const VALIDATION_TRIALS = 200; // first trials re-evaluated with HyperFormula: COMPILED_TOLERANCE 1e-9, GPU_TOLERANCE 1e-4 (relative)
// roundLikeSpreadsheet(values): compiled f64 outputs rounded like HyperFormula's smartRounding → bit-identical to standard
// pool.ts: multicore = pool of evaluation.worker.ts members, each with its own SpreadsheetEngine; chunks handed out as a work
//   queue and written back at their trial index (bit-identical to standard). defaultWorkerCount(threads) = threads − 1, clamped 1…16.
/** Example workbooks (built programmatically): project evaluation, retail inventory, portfolio, etc. */
export const EXAMPLES: { id: string; name: I18nText; description: I18nText; build: () => WorkbookData }[];

HyperFormula custom functions registered by SpreadsheetEngine (so models can also contain risk functions directly, like Risk Simulator's RS* / @RISK's Risk* functions): ORS.NORMAL(mean,sd), ORS.TRIANGULAR(min,mode,max), ORS.UNIFORM(min,max), ORS.PERT(min,mode,max), ORS.LOGNORMAL(mean,sd) — they return the distribution mean in normal recalcs. Finance helpers ORS.MIRR, ORS.PAYBACK(range), ORS.DPAYBACK(rate,range), ORS.PI(rate,range).

@openrisksim/accel ​

Compiles the formulas between assumption (and decision) cells and forecast cells. Pipeline: dependency walk from each forecast (cells that don't depend on inputs become constants) → formula parser (parser.ts) → typed IR with constant folding and HyperFormula-compatible coercion (lower.ts, ir.ts) → JS codegen (jsgen.ts, f64, new Function, with an IR interpreter fallback) and WGSL (wgsl.ts, f32 compute shader, one invocation per trial, explicit error flags) run by gpu.ts.

ts
export function compileModel(source: FormulaSource, model: RiskModel, options?: { extraInputs?: CellRef[]; selfCheck?: boolean }):
  { ok: true; program: CompiledProgram } | { ok: false; reasons: AccelReason[] /* { cell: "Sheet!A1", message: { en, es } } */ };
export interface CompiledProgram {
  inputCount: number; outputCount: number; formulaCount: number; functionsUsed: string[];
  gpuSupport: { ok: true } | { ok: false; reasons: AccelReason[] };   // MEDIAN is CPU-only; ≤ 5000 compiled cells; f32-range constants
  createJsEvaluator(): ModelEvaluator;
  evaluateBatchJs(inputs: Float64Array, n: number, out?: Float64Array): Float64Array;   // row-major n×inputCount → n×outputCount
  toWGSL(): string;
}
export const SUPPORTED_FUNCTIONS: readonly string[];
export function detectGpu(): Promise<GpuInfo | null>;                 // requestAdapter({ powerPreference: "high-performance" })
export function createGpuRunner(program: CompiledProgram): Promise<GpuRunner>; // evaluate(inputs, n, { signal, onProgress }) → Float64Array; dispose()
export function compareOutputs(reference: Float64Array, candidate: Float64Array, opts?: { relTol?: number; absTol?: number; outputCount?: number }):
  { checked: number; maxRelativeError: number; passed: boolean };

FormulaSource is a minimal read-only workbook view (sheetNames, getFormula, getValue, optional getNamedExpression); SpreadsheetEngine satisfies it structurally. The self-check (selfCheck, default true) runs the program on the current values and rejects the compile if any compiled cell differs from the sheet. See Numerical engine.

apps/web ​

Vite + React 19 + TS + Tailwind 4 (@tailwindcss/vite) + ECharts (direct echarts import, wrapper component) + zustand + i18next/react-i18next + lucide-react + vite-plugin-pwa (installable, offline).

Layout (Risk-Simulator-like):

  • Top ribbon with tabs: Archivo/File (open xlsx/csv, examples, save xlsx with model, export report, language), Simulación/Simulation (Define assumption, Define forecast, Define decision, Correlations, Settings, Run, Step, Reset, Copy/Paste/Delete definitions), Herramientas analíticas/Analytical tools (tornado, spider, sensitivity, scenario table, distribution fitting, bootstrap, hypothesis test, overlay charts), Pronóstico/Forecasting (time-series, auto-ARIMA, regression, stochastic processes, trend), Optimización/Optimization, Finanzas/Finance (project evaluator, NPV/IRR calculator, loan amortization, depreciation, WACC/CAPM, break-even), Ayuda/Help.
  • Center: spreadsheet grid (virtualized, sheet tabs, formula bar, cell selection, editing, number formats). Cells with assumptions are green, forecasts blue, decisions yellow (like Risk Simulator).
  • Right dock / floating windows: forecast chart windows (histogram, CDF, certainty sliders with two-tail/left/right + certainty %, statistics, percentiles, overlay), model explorer (tree of assumptions/forecasts/decisions).

Shared app state (apps/web/src/store/*, zustand) — owned by the shell; tool components consume it:

ts
useWorkbookStore: { engine: SpreadsheetEngine | null; workbook: WorkbookData | null; activeSheet: string; selection: { sheet: string; range: string /* "B2:D9" or "B2" */ };
  version: number /* bumps on every change */; loadWorkbook(wb: WorkbookData): void; getSelectionValues(): (number|string|boolean|null)[][];
  writeRange(sheet: string, topLeft: string, values: (number|string|null)[][]): void; addSheet(name: string, rows?: (number|string|null)[][]): void }
useModelStore: { model: RiskModel; setModel(m): void; upsertAssumption(a); removeAssumption(id); upsertForecast(f); removeForecast(id);
  upsertDecision(d); removeDecision(id); setCorrelations(c); setSettings(s) }
useSimulationStore: { status: "idle" | "running" | "done" | "error"; progress: number; result: SimulationResult | null; run(): Promise<void>; abort(): void; reset(): void }
useUiStore: { locale: "es" | "en"; setLocale(l); openTool(toolId: string, props?: unknown): void; closeTool(toolId: string): void; openTools: { id: string; props?: unknown }[] }

Tools (apps/web/src/tools/**) are registered in apps/web/src/tools/registry.ts:

ts
export interface ToolDef { id: string; ribbonTab: "analysis" | "forecast" | "optimization" | "finance"; label: I18nText; icon: LucideIcon; component: React.ComponentType<{ onClose(): void }>; size?: "md" | "lg" | "xl" }
export const TOOLS: ToolDef[];

The shell renders tools from TOOLS as ribbon buttons, and opens each in a resizable modal/window. Shared UI primitives the shell provides in apps/web/src/components/ui/*: Button, Input, NumberInput, Select, Tabs, Modal, Field, Table, RangeInput (text field + "pick from selection" button that reads useWorkbookStore.selection), and Chart (<Chart option={EChartsOption} height={…} />). Translations: shell keys in apps/web/src/i18n/{es,en}.json, tool keys in apps/web/src/tools/i18n/{es,en}.json (namespace tools).

Released under the GPL-3.0 license · © 2026 Fernando Daza and contributors