Installation & privacy
OpenRiskSim is a web application: no need to install Excel, add-ins or programs. It runs on any operating system with a modern browser (Chrome, Edge, Firefox, Safari, Brave…).
Use it in the browser
Open fernandevdaza.github.io/openrisksim and you're done. The first time the app is downloaded (a few MB); afterwards it loads from the browser cache.
Recommended screen
The interface mimics Excel's ribbon and is designed for desktops and laptops. It works on a phone, but it is cramped.
Install it as an app (PWA)
OpenRiskSim is a Progressive Web App: you can install it so it gets its own icon, opens in its own window and works offline.
| Browser | How to install |
|---|---|
| Chrome / Edge / Brave (Windows, macOS, Linux, ChromeOS) | Open the app and click the install icon (⊕ or a monitor with an arrow) at the end of the address bar, or menu ⋮ → Cast, save and share → Install page as app (Edge: … → Apps → Install this site as an app). |
| Safari (macOS Sonoma or later) | Menu File → Add to Dock…. |
| Safari (iPhone / iPad) | Share button → Add to Home Screen. |
| Chrome (Android) | Menu ⋮ → Install app or Add to Home screen. |
| Firefox | Desktop Firefox doesn't install PWAs; keep using it in a regular tab (it also works offline once loaded). |
When a new version is published, the app updates itself the next time you open it online.
Works offline
After opening it once, all the application files are stored in the browser. You can disconnect and keep opening workbooks, simulating and exporting reports.
Privacy: everything stays on your computer
- Your files are never uploaded to a server: they are read and processed inside the browser.
- All computations (formulas, simulation, fitting, optimization) run on your machine; the simulation uses a Web Worker so the screen doesn't freeze.
- Work in progress is saved automatically in the browser's local storage (IndexedDB) so you don't lose it if you close the tab. It is restored when you reopen the app. See Files → Autosave.
- There are no user accounts or sign-ups.
Autosave is not a substitute for saving
Browser storage can be cleared (private mode, clearing browsing data, another browser or computer). Always use File → Save .xlsx to keep your work.
Run it from source
To contribute or use it on a network without internet, you can run it locally. You need Node.js 20+ and pnpm:
git clone https://github.com/fernandevdaza/openrisksim.git
cd openrisksim
corepack enable # enables pnpm
pnpm install
pnpm dev # opens http://localhost:5173To build the static version (folder apps/web/dist, which any web server can serve):
pnpm --filter @openrisksim/web buildMore in Contributing.