Numerical engine ​

This page summarises the algorithms OpenRiskSim uses and their references, for anyone who wants to audit the calculations, cite them or contribute. Everything is implemented in pure TypeScript in packages/* and tested against reference values from Excel, R and SciPy.

Random numbers ​

ComponentAlgorithmReference
Generatorxoshiro128** (128-bit state, period 2¹²⁸ − 1); each double in [0, 1) uses 53 random bitsBlackman, D. & Vigna, S. (2021). Scrambled linear pseudorandom number generators. ACM TOMS 47(4).
SeedingSplitMix32 from the seed, so nearby seeds give unrelated streamsSteele, Lea & Flood (2014). Fast splittable pseudorandom number generators. OOPSLA.

Sampling ​

  • Inverse transform: every value is Q(u), the distribution's quantile at a uniform u. This lets LHS, rank correlation and truncation share one mechanism.
  • Monte Carlo: independent uniforms.
  • Latin hypercube: per column, uᵢ = (π(i) + vᵢ)/n with π a random permutation and vᵢ ~ U[0, 1): exactly one value per 1/n probability stratum. McKay, M. D., Beckman, R. J. & Conover, W. J. (1979). A comparison of three methods for selecting values of input variables in the analysis of output from a computer code. Technometrics 21(2).
  • Truncation: Q_T(u) = Q(F(a) + u·(F(b) − F(a))), using the survival function in the upper tail to keep precision; truncated mean and variance by Gauss–Legendre quadrature in the probability domain.

Correlations ​

  • Iman–Conover: reorders samples to induce the target rank correlation without changing the marginals. Uses van der Waerden scores Φ⁻¹(i/(n+1)), the Spearman-to-Pearson conversion r = 2·sin(πρ/6) and a correction for the scores' sample correlation (Cholesky). Iman, R. L. & Conover, W. J. (1982). A distribution-free approach to inducing rank correlation among input variables. Communications in Statistics – Simulation and Computation 11(3).
  • Nearest correlation matrix: alternating projections with Dykstra's correction. Higham, N. J. (2002). Computing the nearest correlation matrix — a problem from finance. IMA Journal of Numerical Analysis 22(3).

Special functions ​

FunctionMethod
erf, erfcRational approximations from fdlibm (Sun Microsystems), error ≲ 1 ulp
ln Γ(x)Lanczos (g = 7, n = 9) and Stirling series for x ≥ 10
Regularized incomplete betaContinued fraction with the modified Lentz method (Press et al., Numerical Recipes)
Regularized incomplete gammaSeries + continued fraction (Numerical Recipes)
Normal quantileWichura (1988), algorithm AS 241 (PPND16), ~1e−16 accuracy
Inverse incomplete beta / gammaNumerical Recipes initial guess + bracketed Halley iteration (bisection fallback)

Statistics ​

  • Excel conventions: sample standard deviation and variance (n − 1, like STDEV.S), skewness and excess kurtosis like SKEW and KURT, percentiles with linear interpolation like PERCENTILE.INC, Student-t confidence interval of the mean.
  • Histogram: Freedman–Diaconis bin width clamped to 10–100 bins; one bin per integer for integer data with few distinct values.
  • Sensitivity: Spearman rank correlation; contribution to variance = ρ²/Σρ².
  • Precision control: CI half-width of the mean ≤ relative error × |mean|, checked per chunk once 500 trials are done.
  • Non-parametric bootstrap with percentile intervals. Efron, B. & Tibshirani, R. (1993). An Introduction to the Bootstrap.
  • Welch's t-test with Welch–Satterthwaite degrees of freedom.

Distribution fitting ​

  • Maximum likelihood estimation (closed form where available; otherwise Nelder–Mead on an unconstrained parametrisation, with Minka's Newton inverse digamma).
  • Kolmogorov–Smirnov: exact distribution by Marsaglia, G., Tsang, W. W. & Wang, J. (2003). Evaluating Kolmogorov's distribution. Journal of Statistical Software 8(18).
  • Anderson–Darling: Marsaglia, G. & Marsaglia, J. (2004). Evaluating the Anderson–Darling distribution. JSS 9(2); with the D'Agostino, R. B. & Stephens, M. A. (1986), Goodness-of-Fit Techniques, correction for Normal/Lognormal with estimated parameters.
  • χ² with equiprobable bins (continuous) or integer bins with expected count ≥ 5 (discrete).
  • AIC = 2k − 2 ln L; BIC = k ln n − 2 ln L.

Forecasting ​

  • Exponential smoothing (simple, Holt, damped Holt, additive and multiplicative Holt–Winters) in error-correction form, parameters optimised by least squares (bounded Nelder–Mead) and prediction intervals from the innovations representation. Hyndman, R. J. & Athanasopoulos, G. Forecasting: Principles and Practice (FPP); Hyndman, R. J. et al. (2008). Forecasting with Exponential Smoothing. Springer.
  • ARIMA estimated like R's default (CSS-ML): Hannan–Rissanen starting values, conditional sum of squares (CSS), then exact Gaussian likelihood with a Kalman filter (Gardner, Harvey & Phillips, 1980 state-space form); intervals from the ψ-weights.
  • Auto-ARIMA: d from successive ADF tests, then p, q ≤ 3 by AIC, discarding near-unit roots (like auto.arima, Hyndman & Khandakar, 2008).
  • Augmented Dickey–Fuller with approximate p-values from MacKinnon, J. G. (1994). Approximate asymptotic distribution functions for unit-root and cointegration tests. JBES 12(2).
  • Ljung–Box: Ljung, G. M. & Box, G. E. P. (1978). Biometrika 65(2). PACF by Durbin–Levinson. Classical decomposition with a centred moving average.
  • Automatic selection: RMSE on the last 20% of the series (holdout).
  • Metrics: MAE, RMSE, MAPE, sMAPE, R² and Theil's U (against the naive forecast).
  • Regression by least squares via Householder QR; standard errors, t, p-values, CIs, F, ANOVA, VIF and Durbin–Watson; stepwise regression with entry/removal thresholds.
  • Trend lines like Excel's (exponential and power fitted on ln y).
  • Stochastic processes with exact discretisation: geometric Brownian motion (log-normal), Ornstein–Uhlenbeck and Merton jump diffusion. Merton, R. C. (1976). Option pricing when underlying stock returns are discontinuous. JFE 3.

Optimization ​

  • Bounded Nelder–Mead (mapped to the unit box) with restarts; constraints via augmented Lagrangian. Nelder, J. A. & Mead, R. (1965). A simplex method for function minimization. The Computer Journal 7(4).
  • Genetic algorithm: SBX crossover and polynomial mutation (continuous/integer/discrete genes), uniform crossover and bit-flip mutation (binary), binary tournament selection and elitist (μ+λ) survival, all ranked with Deb's feasibility rules. Deb, K. (2000). An efficient constraint handling method for genetic algorithms. CMAME 186.
  • Simulated annealing with per-coordinate adaptive steps (Corana et al., 1987 style) and geometric cooling. Kirkpatrick, S., Gelatt, C. D. & Vecchi, M. P. (1983). Science 220.
  • Automatic: GA when any variable is non-continuous; GA + Nelder–Mead when all are continuous, there are constraints and evaluations are cheap; otherwise Nelder–Mead.
  • Stochastic optimization: each candidate runs a full simulation in the worker and a statistic of the forecast is optimised.

Finance ​

  • IRR: Newton–Raphson from 10%; on failure, a scan of (−99%, 1000%] for sign changes refined with Brent's method (1973). All IRRs: grid search of rates and refinement of each root.
  • Excel conventions for NPV (discounts from the first value), PMT, PV, FV, NPER, MIRR, SLN, DB, DDB/VDB and SYD.

Formula compiler and GPU ​

The @openrisksim/accel package compiles the formulas between assumptions and forecasts so they can be evaluated without HyperFormula (user guide: Acceleration).

  • Scope: depth-first walk from each forecast to its precedents (topological order; circular references are rejected). Only cells that depend on an assumption or a decision variable are compiled; everything else is taken as a constant with the value the sheet computed.
  • Semantics: the typed IR reproduces HyperFormula's coercion rules (empty = 0, TRUE/FALSE = 1/0, simple numeric text; ambiguous text such as typed dates or percentages is rejected) and Excel's conventions for the financial functions (NPV, IRR, PMT…). Constants are folded at compile time. Errors (#DIV/0!, #NUM!…) are represented as NaN and propagate as in the sheet (IFERROR, ISERROR).
  • JavaScript back end (f64): generates a straight-line instruction sequence per trial inside a loop over the batch. Results are rounded to 14 significant digits like HyperFormula does (smartRounding), so they match standard mode bit for bit. If the environment forbids new Function, an IR interpreter is used.
  • Self-check and validation: after compiling, the program runs on the workbook's current values and every compiled cell is compared with the sheet (relative tolerance 10⁻⁹). Before every run, the first 200 trials are also evaluated with HyperFormula (tolerance 10⁻⁹ for JS, 10⁻⁴ for GPU); any mismatch moves on to the next mode.

Single-precision (f32) considerations on the GPU ​

  • The WGSL compute shader uses f32: 24-bit mantissa (ε ≈ 1.19 × 10⁻⁷, about 7 significant digits) and a ±3.4 × 10³⁸ range. Samples are drawn in f64 on the CPU and converted to f32 on upload; results come back as a Float64Array. Sampling, correlations, statistics and sensitivity are still computed in f64: only formula evaluation is f32.
  • WGSL lets implementations assume there are no NaNs or infinities, so every value carries an explicit error flag; an error is written as a quiet-NaN bit pattern and turned into NaN on read-back.
  • The validation's relative error is measured against max(|reference|, |GPU|, 1% of the forecast's scale), so values close to zero (an almost-zero NPV obtained by subtracting large cash flows) are not judged by f32 cancellation.
  • IRR is solved on the GPU with Newton's method (up to 60 iterations, 10⁻⁶ relative tolerance on the rate); long sums (SUM, NPV) accumulate rounding error proportional to the number of terms, which validation monitors.
  • MEDIAN (needs sorting) is CPU-only, and the shader accepts up to 5,000 compiled formulas. One invocation per trial, @workgroup_size(64), in chunks of up to 2²⁰ trials bounded by maxStorageBufferBindingSize.

Spreadsheet engine ​

Formulas are evaluated with HyperFormula (Handsontable), an Excel-compatible engine with dependency-based recalculation, used under GPLv3. .xlsx I/O uses ExcelJS and CSV parsing Papa Parse.