Forecasts & decision variables
Forecasts
A forecast is a result cell whose values are recorded in every simulation trial. When the run ends, each forecast gets its own window with histogram, statistics and percentiles.
Typical forecasts in project evaluation: NPV, IRR, MIRR, payback period, net income of a year, cumulative cash flow, DSCR (debt service coverage), or an indicator such as =IF(NPV>0,1,0).
Defining a forecast
- Select the result cell (usually a formula).
- Click Simulation → Define forecast, Alt+F, or right-click → Define forecast.
- Fill in:
- Name: proposed from the cell's label. Use short names: they appear on the results tabs.
- Result format: Number, Currency or Percent. Only affects how values are displayed in charts and tables (choose Percent for the IRR).
- Initial chart certainty (%): the two-tail band shown when the forecast opens. 90% by default, like Risk Simulator. Any value greater than 0 and less than 100 is accepted (e.g. 97.5); the 80, 90, 95 and 99 buttons set it in one click.
- Confidence of the mean interval (%): level of the confidence interval of the mean shown in the Statistics tab (95% by default). Between 50 and 99.9%, with the same quick buttons.
- Click OK. The cell turns blue.
The dialog shows the cell's Current value so you can check you picked the right one.
Both levels are saved with the forecast (inside the .xlsx) and apply immediately to results already computed: no need to re-run. They are also used in the exported report. Each forecast can have its own levels: for instance 90% for the NPV and 95% for the IRR.
Certainty ≠ confidence
Certainty describes where the outcome will fall (the NPV will lie between A and B with 90% probability); the confidence of the mean interval describes how precise the estimate of the expected value is. See Three intervals not to confuse.
“The cell does not contain a formula”
If the forecast is a constant, it won't change between trials and the histogram will be a single bar. Forecasts are almost always formulas that depend (directly or indirectly) on the assumptions.
Trials with errors
If in some trial the forecast's formula returns an error or a non-numeric value (e.g. #NUM! for an IRR that doesn't exist because all flows are negative), that trial is recorded as an error and excluded from the histogram and statistics. The forecast window and the status bar show how many trials had errors. If there are many, review the model: maybe a distribution generates impossible values (negative prices, say) and should be truncated.
IRR and errors
With very bad cash flows the IRR may not exist. If that happens often, use the NPV as the main forecast and the IRR as a complement; mention the share of trials without an IRR in your report.
Indicator forecasts
A handy trick: create a cell =IF(B34>0,1,0) (1 if the NPV is positive) and define it as a forecast with Number format. Its mean is directly the probability of success. The “Product launch” example does this in cell B24.
Decision variables
A decision variable is a cell you control and that is not uncertain: quantity to produce, plant size, share of the portfolio in each asset, whether to make an optional investment. It isn't simulated; the Optimization tool uses it to search for the best value.
Defining a decision variable
- Select the cell (it must hold a number used by your formulas).
- Click Simulation → Define decision, Alt+D, or right-click → Define decision.
- Fill in:
- Name.
- Type:
- Continuous: any value between the bounds (percentages, amounts).
- Integer: whole numbers only (units, number of machines).
- Binary (0/1): yes or no (do a project or not).
- Discrete (stepped): values between the bounds in fixed steps, e.g. 50 at a time.
- Lower bound and Upper bound (not for binary); Step for discrete.
- Click OK. The cell turns yellow.
TIP
Decision variables don't affect Run: the simulation uses whatever value the cell holds. After optimizing, the optimization tool's Apply solution button writes the optimal values into the cells.
Example: in the Inventory (newsvendor) workbook cell B11 (order quantity) is an Integer decision between 60 and 140, and in Investment portfolio the four weights E6:E9 are Continuous decisions between 0 and 1.