Files: open, save, export ​

OpenRiskSim works with .xlsx files (Excel's format since 2007) and .csv. They are processed inside the browser and never uploaded.

Opening a file ​

  • File → Open (Ctrl+O) and pick the file, or
  • drag the .xlsx or .csv file onto the application window.

Where can the file come from? ​

ProgramWhat to do
Excel (Windows or Mac)Save as Excel Workbook (.xlsx). Macro-enabled .xlsm files also open; macros are ignored.
LibreOffice CalcFile → Save As… → type Excel 2007-365 (.xlsx).
WPS OfficeSave as .xlsx.
Google SheetsFile → Download → Microsoft Excel (.xlsx).
Numbers (Mac)File → Export To → Excel….
Any program.csv, .tsv or .txt with data separated by , ; tab or `

When opening a CSV, OpenRiskSim auto-detects the column delimiter and the decimal separator (1.234,56 or 1,234.56), and understands percentages, currency symbols and negatives in parentheses. It becomes a one-sheet workbook that will be saved as .xlsx.

Unsupported formats

The legacy .xls (Excel 97-2003) and .ods (OpenDocument) formats can't be read. Open them in Excel or LibreOffice and save them as .xlsx. The app shows the same message if you try.

What is preserved when opening ​

PreservedNot preserved
All sheets, values and formulas (shared formulas are expanded)Charts and images
Number formats (currency, %, decimals, dates as serial numbers)Borders, conditional formatting, data validation and comments
Bold, italic, text colour, fill colour and alignmentVBA macros
Column widthsPivot tables and slicers
Defined names
The OpenRiskSim risk model (if the file was saved by the app)

Merged cells are read and saved back as merged, but OpenRiskSim's grid shows them as separate cells (the value is in the first cell of the range).

Work on a copy

Since saving produces a new file without charts or borders, keep your original Excel file and save the OpenRiskSim one under a different name (e.g. project_risk.xlsx).

Saving with the model ​

File → Save .xlsx (Ctrl+S) downloads the workbook to your downloads folder. The file contains:

  • your sheets with formulas, values and formats, and
  • the risk model (assumptions, forecasts, decisions, correlations and settings) in a hidden sheet named _openrisksim.

That sheet is very hidden (veryHidden): it doesn't show in Excel even with “Unhide sheet”, so the file looks and works normally in Excel, LibreOffice or Google Sheets. When you reopen it in OpenRiskSim the model is restored and you'll see “Opened … with N model definitions”.

Don't edit the file in Excel if you want to keep the model

You can open the .xlsx in Excel to look at it or print it. But if you save it from Excel, LibreOffice or Google Sheets, the hidden sheet may be lost or the model's cell references may stop matching if you inserted rows or columns. Make structural changes in OpenRiskSim.

Exporting a report ​

After running a simulation, File → Export report offers three options:

OptionResult
Workbook .xlsx with report sheetsDownloads <name>_informe.xlsx: your workbook with the model plus the sheets Summary, Forecasts, Assumptions, Sensitivity, Simulation data (first 10,000 trials) and Charts (histogram images). Sheet names follow the interface language.
Print / Save as PDFOpens the browser's print dialog with a formatted report; choose Save as PDF as the destination.
Open report in a new tabThe same report as HTML, to review or copy from. If it doesn't open, allow pop-ups for the site.

The report includes the settings, the assumptions with their distributions, statistics, percentiles, charts and sensitivity (contribution to variance) for each forecast. Charts use the certainty ranges you set in each forecast window: to show P(NPV ≥ 0) in the report, set Right-tail ≥ 0 in the NPV window first.

Every results chart also has a PNG button to download the image for your Word or Google Docs report.

Autosave ​

While you work, the workbook and the model are saved automatically in browser storage (IndexedDB). If you close the tab or restart the computer, reopening OpenRiskSim shows “Previous work restored (…)”.

  • One workbook is kept (the latest). Opening another file, an example or a new workbook replaces it.
  • Simulation results are not saved: press Run again (with a fixed seed you'll get the same numbers).
  • In private mode, or if you clear site data, autosave is lost.

ORS.* risk functions ​

Besides defining assumptions with the dialog, you can write them as formulas, like Risk Simulator's RS* or @RISK's Risk* functions:

FunctionSpanish nameDistribution
ORS.NORMAL(mean, sd)ORS.NORMALNormal
ORS.LOGNORMAL(mean, sd)ORS.LOGNORMALLognormal (mean and sd of the variable)
ORS.UNIFORM(min, max)ORS.UNIFORMEUniform
ORS.TRIANGULAR(min, mode, max)ORS.TRIANGULARTriangular
ORS.PERT(min, mode, max)ORS.PERTPERT

In normal recalculation these functions return the distribution mean, so the sheet shows a sensible value.

When you open a file containing cells whose formula is exactly one of these functions with literal numbers (e.g. =ORS.TRIANGULAR(220000,250000,310000)), OpenRiskSim asks “Convert them into model assumptions?”. Click Convert and each cell becomes an assumption with that distribution (named Sheet!Cell). Functions referencing other cells (=ORS.NORMAL(B2,B3)) are not converted automatically: define them with the dialog.

There are also financial helper functions:

FunctionSpanish nameWhat it computes
ORS.MIRR(flows, finance_rate, reinvest_rate)ORS.TIRMModified internal rate of return
ORS.PAYBACK(flows)ORS.RECUPERACIONPayback period (fractional, flows from period 0)
ORS.DPAYBACK(rate, flows)ORS.RECUPERACIONDESCDiscounted payback period
ORS.PI(rate, flows)ORS.IRProfitability index: PV of flows after t0 / |initial investment|

ORS.* functions only exist in OpenRiskSim

If you open the file in Excel, those cells will show #NAME?. If your file must also work in Excel, define assumptions with the dialog (the model travels in the hidden sheet) and keep numeric values in the cells.

Known limitations ​

  • .xls and .ods can't be read (save them as .xlsx).
  • Charts, images, borders and conditional formatting are not shown or preserved.
  • Merged cells are displayed unmerged.
  • Sheets can't be renamed or deleted in the app (you can add them with +).
  • Formulas use the HyperFormula engine: most Excel functions are available, but some very specific ones (cube functions, LAMBDA, advanced dynamic arrays, web functions) may not be and will show an error.
  • Autosave keeps one workbook per browser.